The Channel Tunnel Project Management Essay - 4222 Words
A PROJECT ANALYSIS ON THE DEVELOPMENT OF THE CHANNEL TUNNEL 1.0 INTRODUCTION The Channel Tunnel is one of Europes biggest infrastructure projects ever. The 50.45km long tunnel has fulfilled this old dream by linking Britain and the rest of Europe. The idea of a fixed link between Britain and France was first mooted by a French engineer in 1802; it connects England and France 50m below the seabed of the English Channel. Its not just a tunnel, but a huge infrastructure containing massive machinery and control systems in an underwater tunnel system (Lemley, 1995; Kirkland, 1995). In 1990 the service tunnels broke through at the halfway point. The main rail tunnels met on May 22, 1991 and on June 28, 1991, each accompanied by aâ⬠¦show more contentâ⬠¦Several adaptations to the traditional approaches like agile, interactive, phased, extreme, etc have been made but each will be expected to meet the requirements of the project objectives, timeline, resources, and deliveries of the stakeholders. Other industry standard certifications like ISO9000 and regulatio ns like the Sarbanes-Oxley have also influenced methodologies and processes used by several organisations (Kerzner, 2003). Generally, managing projects should involved five major process which include the project initiation, planning, execution, monitoring and controlling, and then project closing. See Fig. 2 below. [pic] Fig 2: Major Project Management Processes. (Source: US DEPARTMENT OF VETERANS AFFAIRS) The nature and scope of a project is determined at the initiation stage. This involves analyzing the business needs, developing goals, budgets, tasks, deliverables, and the stakeholder analysis. The project planning stage determines the planning team, develops the scope, and identifies work breakdown structure and activities that will be needed to complete deliverables. The planning stage also estimates time and cost activities, develop schedule and risk plan, and gain formal approval for work to begin. The executing stage involves all processes used to meet the project requirement and involves managing people and resources. The process that entails the identification of potential problems andShow MoreRelatedThe State Of Victoria And The City Council933 Words à |à 4 PagesMost of the project fund was supported by the City, State and Federal. The project was originally funded $ 50 million AUD each from both the State of Victoria and the City Council. It was estimated to cost betwee n $ 100 to $ 150 million AUD. Later at its completion, the total final costs was blown out by $ 300 million AUD on top of $ 150 million AUD, reaching at $ 450 million AUD and it was further projected that the final cost will reach at $ 470 million AUD (Misiak 2003). As a result, The StateRead MoreCase Study The Chunnel Project Final3155 Words à |à 9 PagesContents 1.à à Executive summary 2 2.à à Project Appraisal 3 Project initiation 3 Stakeholder and communication management 4 Change/Control Management 5 Risk management 6 Contract 7 Others 7 Works Cited 9 1.à à Executive summary The Chunnel Tunnel project was initiated to connect via a tunnel France and England. It was among the biggest privately funded infrastructure projects ever. Fifty kilometres long, the tunnel extended under the English Channel from France to England. It requiredRead MoreWhat Is Project Management?2916 Words à |à 12 PagesWhat is Project Management? Project irrespective of their size or complexity have 5 basic process groups that adhere to the PMBOK and the 10 knowledge areas. They are initiating, planning, executing, monitoring, controlling and closing. These which allude to the use of knowledge, skills, tools and techniques to project practices to gratify project requirements, is what is project management. (PMBOK) The project manager is responsible for consummating and integrating the project management processRead MoreCritical Analysis Of The Nait Lrt Project1556 Words à |à 7 Pagesprovide a critical analysis of the NAIT LRT Project. The report will provide insights into the causes that resulted in the failure of the project as well as will provide recommendations that would help in the success of the project. The reasons for the delay in the project could be classified into improper management, lack of communication and coordination, failure to test the mechanisms of the plan as well as flaws in the design and developmen t of the project itself. The report also provides recommendationsRead MoreChunnel Project9426 Words à |à 38 PagesProject Management Institute Case Studies in Project Management The Chunnel Project By: Frank T. Anbari, PhD, PMP, Paul Giammalvo, MSPM, CCE, PMP, Paul Jaffe, MSPM, PMP, Craig Letavec, MSPM, PMP, Rizwan Merchant, MSPM Edited by: Frank T. Anbari, PhD, PMP The George Washington University This case studyRead MoreIs Masdar City A Massive Industry?1089 Words à |à 5 Pagesin 2016, however, the date was pushed back to sometime between 2020 and 2025. The date of completion is not the only thing that changed, however, with the expected price of Masdar City going from $22 billion down to $16 billion. The cost of this project is massive, however, the city is not with it only being 2.3 square miles. Everything is compacted together into a square for maximum efficiency. Inside this small city the builders are preparing for a capacity of 40,000 residents and 1,500 businessesRead MoreManaging A Large Site Teams On Mega Project Construction1519 Words à |à 7 Pagessite, in particular leading large site teams on mega-project construction. o Demonstrated leadership skills in developing and leading diverse work teams. o Commercially astute individual with a strong background in contracts management and claims avoidance. o Strong background in industrial relations, with a previous track record of successfully executing work in unionized worker environment. o Experienced in stakeholder interfacing and management. o Possesses strong people skills, with the abilityRead MoreWhy Are Successful Projects so Important to Hewlett-Packard?999 Words à |à 4 PagesChapter 1 Projects in Contemporary Organizations Copyright 2012 John Wiley Sons, Inc. Introduction Rapid growth in project management ï ¬ In the past, most projects were external ï ¬ ââ¬â ââ¬â ââ¬â Building a new skyscraper New ad campaign Launching a rocket Developing a new product Opening a new branch Improving the services provided 1-2 ï ¬ Growth lately is in internal projects ââ¬â ââ¬â ââ¬â 1 8/30/2012 How Project Management Developed ï ¬ Credit for the development of project managementRead MoreA Large Investment Projects1090 Words à |à 5 PagesMegaprojects are very large investment projects. The US Federal Highway Administration describes megaprojects as major infrastructure projects that cost more than US$1 billion, or projects of a significant cost that attract a high level of public attention or political interest because of substantial direct and indirect impacts on the community, environment, and budgets. Some megaprojects, like Boston s Big Dig at $15 billion or the Channel tunnel between France and the UK at $10 billion, cost numerousRead MoreNetwork Tunnel Rail Link Between Britain And Continental Europe3073 Words à |à 13 PagesBudget, This project was initially known as ââ¬ËChannel tunnel Rail linkââ¬â¢ and renamed HS1 in November 2006. HS1 runs at a speed of 300km/h between the channel tunnel and London. In this report, the writer will be discussing the various management features of the HS1 and analyzing the management of the programme. Objective of HS1 Program To develop a national railway system effectively, it is essential to establish what it was intended to achieve as a basis for investment and management (Bolden Harman
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.